Tuesday, December 22, 2009

Well, Mr. Polisher still has ignition covers, pedal spindles didn't happen either & I'm guessing that just how it goes this time of year.
We'll hit it hard after the holiday.
Thanks for the support.

Wednesday, December 16, 2009

New Style Covers

We've had a pretty good response from the new styles.
The "Machining" dimpled & The Rings should be available beginning next week.
*


Saturday, December 12, 2009

A Few New Bits


This week Pat & I busted out a couple of things for 70Moto Chris to take to the Mooneyes X-mas party & The David Mann Chopper Fest.
Kick pedal spindles are not finished yet, hopefully next week. Pat did retro fit an old HD spindle for Chris's Pan.
If your headed to these events stop by & say Hello!



ありがとうございました イチ_カワ

Tuesday, December 8, 2009

LP Weights

These are some sort of Audiophile/DJ tool for one of ML's friends.
Kind of cool chunks of metal.



Friday, December 4, 2009

First Generation Pedals

A few tumbled, a few polished ready for spindles hopefully next week.
sorry for the bad phone pics.


Thursday, November 19, 2009

First few

Caps are in

Bench*Mark hats are done.
*
Black & Navy are the color choices (black shown), Quality mesh, not too tall, with an appliquedpatch.
*
$15 shipped in the US. $20 shipped everywhere else
*
pay pal: Benchmark.cbd@gmail.com

Thursday, November 12, 2009

Working Samples

Pat spun a starter bearing yesterday & that put a halt to dialing in his bike for Saturdays ride so I took the opportunity to put in a few hours on the first working samples of the Kicker pedal & air cleaner.
So far I'm pretty pleased with both. Check them out but keep in mind there will be quite a few changes before they're ready.
I'm thinking the logos will be different on the pedal, some of the lines softened up a bit, a smaller bolt. The air cleaner will be changed the most with no visable logo & a completely different look on the front, a different mounting system & possibly a bit thinner.



Monday, November 9, 2009

Vertical Bolt Pattern Covers Are Done

This is the last of the finned design.

8 vertical bolt pattern (sporty) availbale

$35.00 Shipped in the US
$45.00 Shipped everywhere else.

PayPal To: Benchmark.cbd@gmail.com


Saturday, November 7, 2009

A Couple of Bits in the Works.

Here's a couple of first prototypes of what we're working on. Keep in mind these are the first samples so a lot of changes are going to be made.
The air cleaner you see is real close to the size & shape, we're still working on style & multiple carb mounting methods.
The kick pedal is loosely based on one of my favorite BMX pedals that back then was too expensive for me to own. Anyone know which one?
It also has a ways to go but I'm already pretty stoked on it.



Chop Cult Bolt Covers

Here's the points covers we did for the Chop Cult guys .
We only did two and they'll be placed in the Miles Store were members can redeem milage points for product.
Just like SkeeBall without all those tickets.


The Finned Points Covers Process

I've been ask a bunch of times how we make these points covers look the way they do.
Here it is.


First we cut the material to size and clamp it in the machine. Pat works his keyboard magic & the cutting begins.
-

Fresh out of the CNC Machine
-


Media blast front and back.
-
Next: I bolt each cover to a fixture, clamp it in the vice and rough shape it with an angle grinder/ rough grit flap wheel. Once I'm happy with the rough shape I smooth in the final edges on the bench grinder with an 80 grit flap wheel.
-

Next Step: deburr & smooth any scratches with a Scotch-brite wheel on the bench grinder.
The final steps are the polishing, first with black emery compound and the stitch wheel, secondly with white compound and the poofy polish wheel.
Done.
-